Diploma theme: Change in the Anti-emergency automatic system as a result of the complication of the Kazakhstan’s NEN scheme. North-East-South Anti-emergency control system Stracture of anti-emergency control system Automation of prevention of violation of stability( АПНУ) Why we use method 1-Before ? Principal Scheme of South-East-North transient Thank you for attention
1/8
Средняя оценка: 4.0/5 (всего оценок: 87)
Скачать (751 Кб)
Код скопирован в буфер обмена
1

Первый слайд презентации: Diploma theme: Change in the Anti-emergency automatic system as a result of the complication of the Kazakhstan’s NEN scheme

Done by: Shaimuradov E.S. Research supervisor : Bektemirov A.T.

2

Слайд 2: North-East-South

In 2018 Kegoc finished the Construction of a 500 kV overhead transmission lines which called « North-East-South transit » It allowed to increase the transit potential of the NES in the direction of North-South of Kazakhstan, to ensure coverage of the electricity needs of railways, energy-intensive facilities of the mining industry, and also to create conditions for the development of renewable energy sources, which is especially important in the concept of transition to a “green economy” that implemented in Kazakhstan, and also to strengthen the connection of the Eastern zone with the unified electric system of Kazakhstan.

3

Слайд 3: Anti-emergency control system

Anti- Emergency control system is designed to automatically prevent and localize emergency modes in the event of regulatory disturbances, and it performed : -in order to prevent disturbances in power system stability - in order to eliminate asynchronous modes - prevent unacceptable reduction or increase in frequency, voltage -prevent unacceptable current loads on electrical equipment -increase the allowable power flow in the network

4

Слайд 4: Stracture of anti-emergency control system

5

Слайд 5: Automation of prevention of violation of stability( АПНУ)

In the I-BEFORE algorithm, the size of the decision table for cross-sectional flows, as well as the magnitude of control actions, is automatically determined directly during the operation of the emergency control automation system. In this case, there are two options. According to the first - the calculation is carried out by specialists or coordinating complex, according to the second - directly at the object.

6

Слайд 6: Why we use method 1-Before ?

Method 2-Before in Centralized emergency control system when solving problems of APVS( АПНУ) control redundancy mode limitation Method 1-Before in Centralized emergency c.s.( ЦСПА) - Efficiency -possibility of improvement

7

Слайд 7: Principal Scheme of South-East-North transient